Skip to Main Content

Orange Avenue Redevelopment

The future site of a Stormwater Detention Pond. Tall grass has grown up around one of the old buildings in phase 2. Hardie siding is sitting outside, onsite on some grass. Tractor tires have left marks in the dirt of the cleared Phase 1 site. A large pipe is set into the ground. A tractor works on installing drainage pipes into the large holes in the ground. All the drywall and insulation has been removed from the walls in Phase 2. A tractor is tearing down a building in Phase 2. A tractor works at removing an old building slab. Large storm bypass drainage pipes are stacked up, waiting to be set.